Project Details
Timeline24 Months
Scale1.2M sqft
Budget$120M
Core MaterialsGlass, Steel, Concrete
The Vision
Massive ultra-modern skyscraper complex featuring parametric design and sustainable energy systems. A testament to modern engineering.
The Challenge
The primary challenge was designing a structure that could withstand local seismic activity while maximizing natural light without overheating the interior spaces during peak summer months.
The Solution
We utilized parametric design algorithms to optimize the building's facade, introducing a dynamic shading system. The core was reinforced with a tuned mass damper system to neutralize seismic vibrations.
